Loading...
  OR  Zero-K Name:    Password:   

Post edit history

New Support Structure Idea

To display differences between versions, select one or more edits in the list using checkboxes and click "diff selected"
Post edit history
Date Editor Before After
1/6/2024 7:17:55 PMSErankLobHunter before revert after revert
Before After
1 Agreed, just multiple water levels can use existing pathing as long as there is a particular water level for every location. Tunnels would need new pathing. 1 Agreed, just multiple water levels can use existing pathing as long as there is a particular water level for every location. Tunnels would need new pathing.
2 PS: epic work with dynamic water @malric!